PG&E Concrete Vault Rehabilitation Project

by moxy
Rehabilitation of a failing vault top slab and walls and installation of a lift out opening for access to remove and replace equipment. UCS is able to create a new structural envelope within the existing vault, the original structure remains without any adverse service or maintenance issues. This process dramatically simplifies the task, shortens the time required and reduces the cost of an underground vault replacement.
Recommended Posts

ABB 425 Market Transformer Installation
January 9, 2019

San Francisco Historic Street Light Replacement
December 18, 2018